• Box Column
Box Column

Box Column

Specific drawings will differ and change. Some are like a "#" shape, with all sides coming out, some are like a "mouth", and of course there are also semi-sealed ones. Therefore, you must have drawings when processing box columns, and some also need to add some ribs and the like inside the columns.

Classification :

PRODUCT DETAILS

Keywords: BY Steel Structure

It is named because it is shaped like a large iron box. Generally used as beams or columns on steel structures.
Specific drawings will differ and change. Some are like a "#" shape, with all sides coming out, some are like a "mouth", and of course there are also semi-sealed ones. Therefore, you must have drawings when processing box columns, and some also need to add some ribs and the like inside the columns. Some people also use large square and rectangular tubes instead of box columns. However, due to production capacity limitations, the thickness often does not meet the requirements. Most box columns are submerged arc welded.
The box column is named after its shape like a large iron box. Generally used as beams or columns on steel structures. Specific drawings will differ and change. Some are like a "#" shape, with all sides coming out, some are like a "mouth", and of course there are also semi-sealed ones. Therefore, you must have drawings when processing box columns, and some also need to add some ribs and the like inside the columns. Some people also use large square and rectangular tubes instead of box columns. However, due to production capacity limitations, the thickness often does not meet the requirements. Most box columns are made by submerged arc welding. One of the three seams requires special welding, which is more difficult. General domestic steel structure factories can do it, but each has a different quotation.
box column
The box column is welded by four steel plates. The manufacturing process is roughly the same as that of welding H-shaped steel. The process is shown in the flow chart. ​
The box-shaped column is blanked using a CNC flame cutting machine to cut the column plate. The beveling method is carbon arc gouging to cut a K-shaped groove. After the blanking is completed, it is straightened and corrected. In order to ensure that the column body plate is assembled accurately, an assembly tire needs to be prepared. Membrane, the assembly sequence is: first, the upper cover plate is used as the basis, then the assembly line of the diaphragm and side web plates is released, and the U-shaped assembly is carried out. Finally, the lower cover is assembled and welded after the assembly is completed. The main body of the column is welded by submerged arc automatic welding. , the stiffening plate is welded manually with an electric welding machine, and the last partition plate is welded by electroslag pressure welding, and an arc ignition plate is provided for welding. The production and assembly of box columns is the key. The assembly process is as follows:
1. First, the upper cover plate is used as the assembly reference. On the assembly surface, the partition and side web assembly lines are laid out according to the requirements of the construction drawing, and marked with sample punches. ​
2. First assemble the upper cover and partition, and assemble them on the tire mold. After assembly, welding must be completed before proceeding to the next process. ​
3. Before assembling the web, the straightness of the web must be checked. During assembly, assemble in one direction. Position the middle stiffening plate first and then the web. ​
4. The overall assembly of the box structure is carried out after the U-shaped structure is completed. First, correct the edge of the web of the U-shaped structure to make the unevenness <L/1000. Then release the web assembly positioning line on the lower cover plate, flip it over and match the U-shaped structure. The structure is assembled in one direction, and the positioning spot welding adopts symmetrical welding method. ​
5. The last side of the partition is welded by electroslag pressure welding using special equipment.

 

HONOR QUALIFICATIONS

Chentai Quality System Certification

Chentai Quality System Certification

ISO 9000

ISO 9000

SGS-certificate-based-on-American-standard

SGS-certificate-based-on-American-standard

SGS-certificate-based-on-American-standard

SGS-certificate-based-on-American-standard

SGS

SGS

CE.002020191224

CE.002020191224

BESC

BESC

CCIC

CCIC

CUSTOMER VISIT

Customer visit

Customer visit

Customer visit

Customer visit

Customer visit

Customer visit

Customer visit

Customer visit

Customer visit

Customer visit

Customer visit

Customer visit

Customer visit

Customer visit

Customer visit

Customer visit

QUALITY INSPECTION

Steel-packing

Steel-packing

Measure-the-panel-width

Measure-the-panel-width

Roof-sheeting-thickness-checking

Roof-sheeting-thickness-checking

Nondestructive-testing-2

Nondestructive-testing-2

Clients-inspection

Clients-inspection

Item-numbers-on-the-products

Item-numbers-on-the-products

Fillet-weld-effective-throat-check

Fillet-weld-effective-throat-check

Film-adhesion-test

Film-adhesion-test

FACTORY WORKSHOP

factory

factory

factory

factory

factory

factory

factory

factory

factory

factory

factory

factory

factory

factory

factory

factory

FAQ

Q1: Are you a manufacturer?

Q1: Are you a manufacturer?

A: Yes , we are a manufacturer, We have own factory, which is located in LiaoCheng,China. We have a leading power in producing and exporting galvanized steel coil,galvalume steel coil,ppgi etc. We promise that we are what you are looking for.
A: Yes , we are a manufacturer, We have own factory, which is located in LiaoCheng,China. We have a leading power in producing and exporting galvanized steel coil,galvalume steel coil,ppgi etc. We promise that we are what you are looking for.
Q2:Can we visit your factory ?

Q2:Can we visit your factory ?

A:Warmly welcome once we have your schedule we will pick you up .
A:Warmly welcome once we have your schedule we will pick you up .
Q3: Do you have quality control?

Q3: Do you have quality control?

A: Yes, we have gained BV, SGS authentication.
A: Yes, we have gained BV, SGS authentication.
Q4: Can you arrange the shipment?

Q4: Can you arrange the shipment?

A: Sure, we have permanent freight forwarder who can gain the best price from most ship company and offer professional service.
A: Sure, we have permanent freight forwarder who can gain the best price from most ship company and offer professional service.
Q5: How long is your delivery time?

Q5: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 25-45 days if the goods are not in stock, it is according to quantity.
A: Generally it is 7-14 days if the goods are in stock. or it is 25-45 days if the goods are not in stock, it is according to quantity.
Q6:How can we get the offer?

Q6:How can we get the offer?

A:Please offer the specification of the product,such as material,size,shape,etc.So wecan give the best offer.
A:Please offer the specification of the product,such as material,size,shape,etc.So wecan give the best offer.

RELATED PRODUCTS


GET A FREE QUOTE

Shandong BY Steel Structure Co., Ltd

Apply For Discount !

24 Hours Online Service

Provide You With Free Industry Solutions

Quality Assurance

%{tishi_zhanwei}%